top of page
Search


CERC Moves to Free Up Idle Grid Capacity for Renewable Push
CERC’s staff paper proposes converting, substituting, or auctioning idle LOA‑based grid connectivity to ensure efficient transmission use. These reforms aim to accelerate India’s 500 GW green energy integration and support the net‑zero pathway by enforcing discipline, transparency, and locational efficiency. The Central Electricity Regulatory Commission (CERC) staff paper (SP‑251125) addresses a critical bottleneck in India’s Renewable Energy (RE) integration: connectivity gr

RE Society of India RESI
6 days ago4 min read
Â
Â
Â
bottom of page


