top of page
Search


Rajasthan’s Draft BESS Regulations 2025: A Strategic Blueprint for Grid Stability and Renewable Integration
The Rajasthan Electricity Regulatory Commission (RERC) has released the draft Battery Energy Storage Systems (BESS) Regulations, 2025 , marking a pivotal step in institutionalizing energy storage across the state’s power sector. This regulation provides a comprehensive framework for ownership, deployment, utilization, and tariff mechanisms for BESS, aligning Rajasthan with national ambitions for a flexible, decarbonized grid. Key Highlights of the Draft Regulation Ownership M

RE Society of India RESI
3 days ago2 min read
Â
Â
Â


India’s Firm Renewable Energy Auctions: Setting a New Benchmark for Solar-Plus-Storage Investments
Abstract India’s renewable energy landscape is entering a new phase where firm, dispatchable power is no longer a distant goal but a...

RE Society of India RESI
Sep 2611 min read
Â
Â
Â


SECI’s 600 MW/1200 MWh BESS EPC Tender: Pioneering Standalone Energy Storage with Long Term Operational Risk
The Solar Energy Corporation of India (SECI) has issued a groundbreaking EPC‑turnkey tender for a 600 MW / 1200 MWh standalone Battery...

RE Society of India RESI
Aug 53 min read
Â
Â
Â


India’s Grid Enters Energy Storage Era: Maharashtra Float 2000 MW / 4000 MWh BESS Tenders to Anchor Renewable Transition
Back-to-back mega tenders from MSEDCL and GUVNL signal a paradigm shift in India’s power sector as battery storage becomes central to...

RE Society of India RESI
Aug 42 min read
Â
Â
Â
bottom of page


